Ipswich tower block repair costs could reach £30m
Construction on the tower block on the waterfront started in 2007 Costs to repair structural and fire safety issues on a tower block in Ipswich could reach £30m, administrators said. The freeholder of The Mill development went into administration in 2010. Administrators, RSM UK, told residents that funds were […]